SCOOTER'S COFFEE

New Construction

MARION, ARKANSAS

Elite Earthworks completed the site development for this new coffee shop in Marion, Arkansas. Our scope included erosion and sediment control, stormwater culvert and headwall installation, aggregate subbase preparation, and a five-foot undercut in the main drive area to address poor soil conditions and high moisture levels. The result was a stable, properly engineered site ready for paving and construction.

PROVEN PERFORMANCE

A closer look at earthwork projects delivered on time and with excellence.
olemiss

Elite Earthworks managed subdrainage and stormwater work at Brevard Hall, ensuring proper drainage and site stability.

Invenergy-logo

Site development for Invenergy’s Chalk Bluff Solar Farm, including mass excavation, structural fill placement, and erosion control.

reserves-logo

Site development for Invenergy’s Chalk Bluff Solar Farm, including mass excavation, structural fill placement, and erosion control.

Trusted By

Building lasting relationships with those who shape our region.

GROUNDWORK FOR GREATNESS.