Oxford, Mississippi
The purpose of this project was to upgrade the drainage system around the building to prevent it from flooding. This project involved our crews utilizing trench safety and shoring techniques, hydro excavating around lots of live utility lines, removing and replacing storm drainage, maintaining proper erosion and sediment control measures, concrete and excavation.
PROVEN PERFORMANCE
A closer look at earthwork projects delivered on time and with excellence.
New coffee shop site development featuring stormwater installation, soil stabilization, and paving preparation.
Site development for Invenergy’s Chalk Bluff Solar Farm, including mass excavation, structural fill placement, and erosion control.
Site development for Invenergy’s Chalk Bluff Solar Farm, including mass excavation, structural fill placement, and erosion control.
Trusted By
Building lasting relationships with those who shape our region.









